Home / Factory
What you would see on a visit
Most buyers can't fly to Foshan this month. So here is the floor, the numbers, and the checkpoints — the same things we walk you through on a video call.
Production capacity
| Item | Capacity |
|---|---|
| Production lines | 6 (panel · upholstery · tile · assembly) |
| Panel throughput | 800 panels / day, 2 shifts in peak season |
| Plant area | 18,000 m² (production + warehouse) |
| Monthly container load | 60–80 × 40HQ |
| Standard lead time | 25–30 days after deposit, ±3 days |
| Peak-season lead time | 35–40 days (Aug–Nov) |
| Sample lead time | 7–10 days |
6lines
800panels / day
23QC checkpoints
60–80containers / month
23 QC checkpoints — where things actually go wrong
A QC list that says "we check everything" is worthless. These are the four that cause most claims, and what we do about each.
| Stage | What we check | What goes wrong if skipped |
|---|---|---|
| Incoming board | Density, thickness tolerance, formaldehyde grade per batch | Warping 3 months after delivery; customs rejection on CARB |
| Edge banding | Peel strength, glue temperature, 2 mm ABS on exposed edges | Edges lift in humid climates — the #1 complaint in Gulf and coastal markets |
| Assembly trial | 1 in 20 units dry-assembled before packing | Hole misalignment; buyer's installer charges you back |
| Packing & loading | 5-layer corrugated, corner protectors, moisture barrier, container photo set | Corner damage and moisture claims; no evidence to defend against them |
Every shipment leaves with a QC report and a photo set of loading. If a claim comes in, we can trace it to a batch and a checkpoint.
Book a factory visit
Two options, both free. We only ask that you tell us the product family in advance so the right line manager is on the floor.
① Live video walk — 40 minutes, WhatsApp or Zoom
② On-site visit — we arrange pickup from Guangzhou / Foshan
③ Third-party audit — SGS / TÜV / BV, at your cost, we cooperate fully
Request a walkthrough
Want the QC checklist we actually use?
It's the same 23-point form our inspectors sign. Ask for it and we'll send the PDF.